Protective coating & sports flooring systems

Protection, performance, and color—layer by layer.

Select your application and build a complete system from substrate to finish.

Interactive coating system selector

1. Select application

2. Your recommended system

Polyurea floor system

Solvent-free protective floor build for prepared concrete, with an optional UV-stable clear finish.

Exploded four-layer polyurea floor system over concrete
Technical documentsAccess current TDS and SDS by product and system.View documents → Substrate & preparation guidanceReview base types, surface preparation and project conditions.View guidance → OEM / ODM supportDiscuss custom systems, packaging and private-label requirements.Contact support →

What determines fit

Five inputs prevent an attractive coating from becoming the wrong coating.

  1. SubstrateConcrete, steel, existing coating or another surface.
  2. ExposureWater, UV, chemicals, thermal cycling or immersion.
  3. LoadsFoot traffic, forklifts, impact, abrasion or movement.
  4. DowntimeApplication window and required return-to-service.
  5. FinishSlip profile, color, cleanability and appearance.

Evidence before adjectives

Give procurement and technical teams something they can verify.

The production site should place current documents, test reports, certificate scope and real project records next to the relevant claim—not bury them in a generic download page.

  • Revision-controlled TDS and SDS
  • Test method, specimen and result context
  • Certificate number, scope and expiry
  • Real project photos, conditions and limitations

What happens after you contact us

A technical inquiry should feel like the start of specification—not a generic inbox.

  1. 01

    Share conditions

    Tell us the substrate, environment, area or quantity, target finish and timeline.

  2. 02

    Technical review

    The relevant system family, open questions and required preparation are identified.

  3. 03

    Confirm evidence

    Review current product documents, samples and any project-specific qualification needs.

  4. 04

    Quote & next step

    Align specification, packaging, logistics and commercial terms before ordering or sampling.

Request a coating recommendation

Get a useful first response, not another round of basic questions.

Share the project conditions below. MPU states a one-business-day inquiry response target; technical confirmation may require additional documents or samples.

Email [email protected] Location

Jiangmen, Guangdong, China

What to include

Send the conditions that determine a compatible coating system.

  • Application and substrate
  • Area or order quantity
  • Exposure, loads and target finish
  • Project location and required timeline
Send project details Or email [email protected]

A technical response may require current project drawings, samples or supporting documents.

WE WILL REPLY YOU IMMEDIATELY