Polyurea, epoxy & sports flooring materials
Complete coating systems—from primer to topcoat.
Match the substrate, exposure and finish to the right MPU system.
Interactive coating system selector
1. Select application
2. Your recommended system
Polyurea floor system
Solvent-free protective floor build for prepared concrete, with an optional UV-stable clear finish.

- 01PrimerP04NRequired
Solvent-free epoxy primer for approved concrete substrates.
- 02IntermediateM02NRequired
Solvent-free polyurea-polyurethane leveling coat.
- 03TopcoatT06N-GL-UVRequired
Solvent-free exterior gloss topcoat with a UV route.
- 04Clear finishF06V-UVConditional
Optional clear protective finish after compatibility confirmation.
What determines fit
Five inputs prevent an attractive coating from becoming the wrong coating.
- SubstrateConcrete, steel, existing coating or another surface.
- ExposureWater, UV, chemicals, thermal cycling or immersion.
- LoadsFoot traffic, forklifts, impact, abrasion or movement.
- DowntimeApplication window and required return-to-service.
- FinishSlip profile, color, cleanability and appearance.
Evidence you can check
Reduce supplier risk with evidence you can verify.
Review MPU’s company details, factory and packaging photographs, technical document status, and application records. Where product selection or performance depends on the substrate, service conditions, or project requirements, we flag it clearly and confirm it with you before quoting.


Choose the right inquiry route
Procurement and specification need different first answers.
Distributor / importer
Confirm the market, product family, estimated quantity, packaging or private-label needs, destination and timing.
Start distributor inquirySpecifier / contractor
Confirm the substrate, exposure, system build, application window and technical-document requirements.
Start technical inquiryWhat happens after you contact us
A technical inquiry should feel like the start of specification—not a generic inbox.
- 01
Share conditions
Tell us the substrate, environment, area or quantity, target finish and timeline.
- 02
Technical review
The relevant system family, open questions and required preparation are identified.
- 03
Confirm evidence
Review current product documents, samples and any project-specific qualification needs.
- 04
Quote & next step
Align specification, packaging, logistics and commercial terms before ordering or sampling.
Request a coating recommendation
Get a useful first response, not another round of basic questions.
Share the project conditions below. MPU states a one-business-day inquiry response target; technical confirmation may require additional documents or samples.
What to include
Send the conditions that determine a compatible coating system.
- Application and substrate
- Area or order quantity
- Exposure, loads and target finish
- Project location and required timeline
A technical response may require current project drawings, samples or supporting documents.