Company, factory and supplier approval
Coating manufacturing evidence buyers can verify.
Review the legal company identity, real facility and logistics photographs, document limits and the information required for supplier approval.
Company record
Check who you are buying from before sending an inquiry.
MPU Coatings is the export-facing brand of Jiangmen Choi Sum Environmental Materials Co., Ltd. The published operating address is Lingang Industrial Zone, Gujing, Xinhui, Jiangmen, Guangdong 529145, China.
The website presents polyurea, epoxy and sports-surface material systems. Final product selection, compatibility, compliance documents and commercial terms must be confirmed for the destination market and project conditions.
- Legal company
- Jiangmen Choi Sum Environmental Materials Co., Ltd.
- Operating address
- Lingang Industrial Zone, Gujing, Xinhui, Jiangmen, Guangdong 529145, China
- Published product families
- Polyurea, epoxy and sports flooring materials
Factory evidence
See the facility, production equipment and physical inventory
These photographs show MPU's facility and material-handling environment. Production capacity, certification scope and product performance are confirmed separately with current documents for the proposed order.




Supplier approval
Separate what is visible now from what must be current at order time
A photo or old certificate is not a substitute for current approval documents. Use this checklist when qualifying MPU for a project or distribution agreement.
Visible on the website
- Legal company name, address and direct contact channels
- Factory, warehouse, packaging and loading photographs
- Published product-code TDS files and system-selection pages
- Document limitations and items requiring technical confirmation
Request for current approval
- Current business registration and certificate copies
- Certificate number, scope, issuer and expiry date
- Current TDS and destination-appropriate SDS
- Product packaging, label, sample and batch-document requirements
- Quotation, MOQ, lead time, loading plan and commercial terms
Choose your buying route
Send the information that changes the technical and commercial answer
Distributor / importer
Confirm the target market, product family, estimated order quantity, packaging or private-label needs, destination port and required timing.
- MOQ and supply unit
- Sample availability
- OEM / ODM scope
- Label and export-document requirements
Specifier / contractor
Confirm the substrate, preparation, exposure, traffic or movement, target build, installation window and required technical documents.
- System and model selection
- Compatibility and limitations
- TDS / SDS and method statement
- Sample or trial-area requirements
Application photographs
See the finishes and installation environments represented in MPU's records.
Project names and measured outcomes are not attached to these photographs, so they show application context rather than verified performance case studies. Ask for a project-specific reference if required for approval.




For a formal reference, request a record that identifies the substrate, complete system build, application date, service conditions and available outcome evidence.
Commercial confirmation
Packaging and loading are visible; order terms still depend on the quotation
- MOQ
- Confirm by product, packaging route and destination.
- Packaging
- Use the current TDS and written quotation for final supply-unit details.
- Samples
- Confirm availability, quantity, freight and evaluation method.
- Lead time
- Confirm after quantity, labeling, documentation and shipment method are fixed.
- OEM / ODM
- Confirm formulation, label, pack size, minimum run and market-compliance scope.
Need a system recommendation for your project?
Share the application, substrate, exposure, area or quantity and project timing so the inquiry can be routed with the conditions that matter.
Share project conditions